Fugro is using Merus rings on the Drilling Vessel MV Bucentaur

2020-05-20T14:09:53+02:00June 1st, 2013|Categories: All, Merus|Tags: , , , |

The company Fugro Netherlands has given the order to install the following Merus rings on the Geotechnical Drilling Vessel MV Bucentaur One 1 1/2" High Industrial Capacity Bio Ring at the Hydro for and a 2" High Industrial Capacity Bio Ring for the sanitary system

Boskalis is using Merus Technology for Hopper Dredger Oranje

2020-05-20T14:11:31+02:00June 1st, 2013|Categories: All, Merus|Tags: , , , |

The company Boskalis in the Netherlands has given the order to install the following Merus rings on the Hopper dredger Oranje For the Evaporator a 4" and a 1 1/2" High Industrial Capacity Ring and at the Calorifier a 2" and a 1 ½" High

Fitness First working with Merus Technology

2020-05-20T14:11:44+02:00June 1st, 2013|Categories: All, Merus|Tags: , , , , |

After installation of Merus devices in 193 Fitness First clubs in the United Kingdom the management of Fitness First in the Netherlands decided to equip their 25 Fitness First clubs with Merus devices. This decision was made after a test period of 3 months at

Hotel Ara – van der Valk Group is using the Merus Technology

2020-05-20T14:12:08+02:00June 1st, 2013|Categories: All, Merus|Tags: , , , |

The management of Hotel Ara (van der Valk Group) decided to equip their hotel with Merus devices. This decision was made after a test period of 3 ½ months in their Hotel. The Merus devices were installed in the second part of 2008. The management

Riyadh Refinery Tests New Merus Technology

2020-05-20T14:14:04+02:00June 1st, 2013|Categories: All, Merus|Tags: , , , , |

RIYADH, October 08, 2008 -- Heat. Pressure. Chemicals. Corrosion. Saudi Aramco industrial facilities often take a beating. Fouling and scaling reduce heat transfer in exchanger tubes and cause corrosion in pipes. That can lead to a loss of production as unplanned shutdowns become necessary to

Title

Go to Top